Scope:44 t/h 61.8 bar(g) 465 oC ± 5 oC Atmospheric Fluid Bed Boiler
4.4MWe Counter Pressure Steam Turbine Power Plant
Fuel delivery system
Ash transport system
Filtration systems
Çankırı Saltı Salt Factory Power Plant
We undertake it as EPC.
Scope:44 t/h 61.8 bar(g) 465 oC ± 5 oC Atmospheric Fluid Bed Boiler
4.4MWe Counter Pressure Steam Turbine Power Plant
Fuel delivery system
Ash transport system
Filtration systems