This project was the first CFB in Turkey.Total erected weight is 53,000 ( 2 units - Boilers steel structure, Pressure parts, Non pressure parts, Piping, Gas and air ducts, ESP, FGD, Turbine and generator, Turbine hall equipment, Condenser, BOP, Auxiliary boiler, Fuel oil system, Coal and Ash handling system, Demi water system, Compressor station, Water and fuel tanks, Insulatıon works, Refractory works, HVAC and Fire fighting systems, All electrical works- Cable trays. Cabling etc.)
![]() |
![]() |
![]() |
![]() |