Scope : The copmlete mechanical erection works of the power plant . Total erected weight is 34,000 ( Boilers steel structure, Pressure parts, Non pressure parts, Piping, Gas and air ducts, ESP, FGD, Turbine and generator, Turbine hall equipment, Condenser, BOP, Auxilliary boiler, Fuel oil system, Coal and ash handling system, Limestone handling system, Insulatıon works, Refrectory works, HVAC and Fire fighting systems.