Scope :Erection Works of :
1-ESP ( rehabilitation and changing of internals) 2-Coal mills
3-ID and FD fans
4-Pump stations
5-Coal conveyors
6-Ash removal system
In this power plant we gained the experience of rehabilitation and erection at the same time. Before the erection of any of the above mentioned , we performed the maintainance of the related parts then the erection of all the parts is done in line with the normal erection methods.
![]() |
![]() |
![]() |
![]() |